Causes of Cost Overrun in Construction Projects in Auckland
Main Article Content
Abstract
Cost is a key indicator in measuring the success of projects. It is also a significant cause of project failures. The construction industry is overwhelmed with failures experiencing big losses due to project cost overruns throughout the country. The effects of this are not limited to individual project with huge losses occurring in public projects and potentially affecting the economic growth of the country. This research identified the factors responsible for project failures due to cost overrun in the construction industry in Auckland, New Zealand. The study also aimed to identify the current methods employed to avoid such losses. The research identified 15 primary factors further broken down into 51 sub-factors, potential to affect cost in construction project. The results showed that three main factors that caused project failures due to cost overruns, were namely optimism bias, procurement method and scope change. The interrelationships between cost overrun factors were identified and illustrated using the construction project cost influencers and contributors model.
Article Details

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Authors retain copyright ownership of their work. NZJABR owns copyright in the final formatted and published version of the authors’ work.
Articles published in NZJABR since 1 December 2023 are published under a Creative Commons Attribution NonCommercial license 4.0 International. Readers have immediate free access to the articles and are permitted to read, download, copy, distribute, print, search, or link to the full texts of articles, crawl them for indexing, pass them as data to software, or use them for any other lawful purpose, provided that:
- They must give appropriate credit to the authors, and to NZJABR as first publisher, provide a link to the license, and indicate what changes if any they have made, while avoiding any suggestion that the authors or NZJABR endorse their use of the work.
- They may not use the content for commercial purposes.
Plaudit
References
Abd El-Karim, M. S., El Nawawy, O. A., & Abdel-Alim, A. M. (2015). Identification and assessment of risk factors affecting construction projects. Housing and Building National Research Center, 202-216.
Aje, O. I., Olatunji, O. A., & Olalusi, O. A. (2017). Overrun causation under advance payment regimes. Built Environment Projects and Asset Management, 7(1), 86-98.
Asiedu, R. O., Frempong, N. K., & Alfen, H. W. (2017). Predicting likelihood of cost overrun in educational projects. Engineering, Construction and Architectural Management, 24(1), 21-39.
Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large constrcution projects. International Journal of Project Management, 24, 349-357.
Atkinson, R. (1999). Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria. International Journal of Project Management, 17(6), 337-342.
Basit, T. N. (2003). Manual or electronic? The role of coding in qualitative data analysis. Educational Research, 45(2), 143-154.
Boyce, C., & Neale, P. (2006). COnductiong In-depth interviews: A guide for designing and conducting in-depth interviews for evaluation input. PATHFINDER INTERNATIONAL TOOL SERIES- Monitoring and Evaluation – 2.
Campbell, J. L., Quincy, C., Osserman, J., & Pedersen, O. K. (2013). Coding In-depth Semistructured Interviews: Problems of Unitization and Intercoder Reliability and Agreement. Sociological Methods & Research, 42(3), 294-320.
Chevroulet, T., Giorgi, L., & Reynaud, C. (2012, Dec 1). New Approach for the Assessment of High-Speed Rail Projects and How to Contain Cost Overruns: Lessons from the EVA-TREN Project. Journal of Infrastructure Systems, 18(4), 297-304.
Cunnigham, T. (2017). Cost Control during The Construction Phase of the Building Project: The Consultant Quantity Surveyor’s Perspective. Dublin Institute of Technology, School of Surveying and Construction Management. Dublin: Dublin Institute of Technology.
Dada, M. O. (2014). The influence of project team relationships on cost growth. Journal of Financial Management of Property and Constrcution, 19(1), 76-94.
Doloi, H. (2013). Cost Overruns and Failure in Project Management: Understanding the Roles of Key Stakeholders in Construction Projects. Journal of Constrcution Engineering and Management, 139(3), 267-279.
Fletcher Building. (2018). Focus - Annual Report. Auckland: Fletcher Building.
Flyvbjer, B., Holm, M. S., & Buhl, S. (2014, March). Underestimating Costs in Public Works Projects. Journal of the American Planning Association, 68(3), 279-295.
Flyvbjerg, B. (2006). Curbing Optimism Bias and STrategic Misrepresentation in Planning: Reference Class Forecasting in Practice. Europen Planning Studies, 16, 3-21.
Flyvbjerg, B. (2017). Introduction: The Iron Law of Megaproject Management. In B. Flyvbjerg, The Oxford Handbook of Megaproject Management (pp. 1-18). Oxford: Oxford University Press.
Flyvbjerg, B., Ansar, A., Budzier, A., Buhl, S., Cantarelli, C., Garbuio, M., . . . Wee, B. V. (2018). Five things you should know about cost overrun. Transportation Research Part A Policy and Practice.
Flyvbjerg, B., Skamris, H. M., & Buhl, S. L. (2003). How common and how large are cost overrun in transport infrastructure projects? Transport Reviews, 23(1), 71-88.
Flyvbjerg. (2011). Over budget, over time, over and over again. In M. P. W.G., J. K. Pinto, & J. Soderlund, The Oxford Handbook of Project Management (pp. 321-344). Oxford University press.
Gebrehiwet, T., & Luo, H. (2017). Analysis of Delay Impact on Construction Project Based on RII and Correlation Coefficient: Empirical Study. Creative Construction Conference. 196, pp. 366-374. Primostem, Crotia: Procedia Engineering.
Hewage, K., Ganorruwa, A., & Ruwanpura, J. (2011). Current status of factors leading to team performance of onsite construction performance in Alberta building construction projects. Canadian Journal of Civil Engineering, 38, 679-689.
Jackson II, R. L., Drummond, D. K., & Camara, S. (2007). What is Qualitative Research? Qualitative Research Reports in Communication, 8(1), 27-28.
Johansen, A., Sandvin, B., Torp, O., & Okland, A. (2014). Uncertainty analysis - 5 challenges with today's practice. Procedia – Social and Behavioral Sciences, 119, pp. 591-600.
Josephson, P.-E., Larsson, B., & Li, H. (2002). Illustrative Benchmarking Rework and Rework Costs in Swedish Construction Industry. Journal of mAnagement in Engineering, 18(2), 76-83.
Klakegg, O. J., & Lichtenberg, S. (2016). Successive cost estimation - successful budgeting of major projects. 29th World Congress International Project Management Association (IPMA) 2015. 226, pp. 176-183. Procedia - Social and Behavioral Sciences.
Koushki, P. A., & Kartam, N. (2004). Impact of construction materials in project time and cost in Kuwait. Engineering, Constrcution and Architectural Management, 11(2), 126-132.
Kwakye, A. (1997). Construction Project Administration in Practice. Wokingham: Addison Wesley.
Lo, T., Fung, I. W., & Tung, K. C. (2006). COnstrcution delays in Hongkong civil engineering porjects. Journal of Counstruction Engineering and Management, 132(6), 636-649.
Love, P. E., Wang, X., Sing, C.-p., & Tiong, R. L. (2013, March 1). Determining the probability of project cost overruns. Journal of Construction Engineering and Management,, 139(3), 321-330.
Mason, J. (2002). Qualitative Researching; Second edition. London: SAGE Publications Ltd.
MBIE. (2013). The New. New Zealand Government, MBIE. Wellington: New Zealand Government.
MBIE. (2015). Building a Future. Ministry of Business, Innovation and Empolyment.
Oladapo, A. (2007). A qualitative assessment of the cost and time impact of variation orders on construction projects. Journal of Engineering, Design and T2007echnology, 5(1), 35-48.
Orb, A., Eisenhauer, L., & Wynaden, D. (2001). Ethics in Qualitative Research. Journal of Nursing Scholarship, 33(1), 93-96.
Park, Y.-I., & Papadopoulou, T. C. (2012). Causes of cost overruns in transport infrastrcuture projects in Asia. Built Environment Project and Asset Management, 2(2), 195-216.
Peansupap, V., & Cheang, L. (2015). Identifying issues of change leading to cost conflicts:case study in Cambodia. Creative Construction Conference. 123, pp. 379-387. Procedia Engineering.
PwC. (2016). Valuing the role of construction in the New Zealand economy. Auckland: Construction Strategy Group.
Rahman, A. I., Memon, A. H., & Abd. Karim, A. T. (2013). Significant Factors Causing Cost Overruns in Large Constrcution Projects in Malaysia. Journal of Applied Sciences, 2, 286-293.
Ramachandara, T., & Rotimi, J. O. (2012). Liquidation and its effects on constrcution trade creditors in New Zealand. Journal of Financial Management of Property and Construction, 17(2), 166-175.
Ramos, M. (1989). Some ethical implications of qualitative research. Research in Nursing & Health, 57-63.
Rauzana, A. (2016). Cost overruns and failure in constrcution projects. IOSR Journal of Business and Management, 18(10), 80-83.
Riffe, D., Lacy, S., & Fico, F. (2005). Analyzng media messages:Using quantitaive content analysis in research. Mahwah: NJ: Lawrence Erlbaum Associates.
Sanjari, M., Bahramnezhad, F., Fomani, F. K., Shoghi, M., & Cheraghi, M. A. (2014). Ethical challenges of researchers in qualitative studies: the necessity to develop a specific guideline. Journal of Medical Ethics and History of Medicine.
Shane, J. S., Molenaar, K. R., Anderson, S., & Schexnayder, C. (2009). Construction Project Cost Escalation Factors. Journal of Management in Engineering, 25(4), 221-229.
Shepperd, J. A., Caroll, P., Grace, J., & Terry, M. (2002). Exploring the causes of comparitive optimism. Psychologica Belgica, 42, 65-98.
Smith, P. (2014). Project Cost Management - Global Issues and Challenges. 27th IPMA World Congreee. 119, pp. 485-494. Procedia - Social and Behavioral Sciences.
Tookey, J. (2018, August 01). How is a major contractor going bust in the middle of NZ’s building boom? (H. Oliver, Interviewer) The Spinoff.
Tseng, C.-L., Y., L. K., & Sundararajann, S. K. (2005). Managing cost overrun risk in project funding allocation. Annals of Opertations Reseacrh, 135, 127-153.
Wanjari, S. P., & Dobariya, G. (2016). Identifying factors causing cost overrun of the constrcution projects in India. Sadhana – Academy Proceedings in Engineering Sciences, 41(6), 679-693.